
Add to Cart
Readycome New Tech Energy Saving Prefabricated Submersible Pumping Station For Water Control And Sewage Treatment Solution
Core advantages
Efficient construction
The prefabrication rate in the factory reaches 90%, and on-site installation only takes 1-2 weeks (traditional pump stations take several months), reducing civil engineering costs by 20% to 40%.
Intelligent operation and maintenance
Support unmanned operation and remote monitoring of real-time data (traffic, energy consumption, faults); Automatic dredging design reduces blockages.
environmentally friendly
Underground design saves surface space and reduces noise levels to below 60 decibels; Sealed structure to prevent leakage and avoid soil pollution.
Long lasting and durable
The fiberglass cylinder is resistant to chemical corrosion and has a lifespan of over 30 years; The water pump coupling device is easy to disassemble and maintain quickly
![]() | ![]() |
Collection of rainwater in low-lying urban areas | Lake water circulation |
![]() | ![]() |
Renovation and expansion of the old pumping station | Urban sewage treatment plant sewage collection and transportation |
![]() | ![]() |
Construction and renovation of municipal sewage pipe network | Sewage collection and transportation in urban and rural areas |
![]() | ![]() |
Water conveyance project | Hydraulic engineering |